API 936 Refractory Inspection

API 936 Refractory Inspection

[wpdatatable id=”7″]

INTRODUCTION

Refractory Personnel Certification Program will be based on testing candidates’ knowledge of API Recommended Practice 936, Refractory Installation Quality Control Guidelines. API Recommended Practice 936 provides guidelines for the installation quality control of monolithic refractory linings and may be used to supplement owner specifications.  The document includes material, equipment and personnel qualification requirements along with procedures and responsibilities for quality control inspection personnel.  Refractory quality is closely monitored based on the document’s defined procedures and acceptance criteria.

The purpose of the program is to provide third-party certification of refractory inspection personnel by examination.  The certification examination would cover, at a minimum, the following criteria defined by API Recommended Practice 936, “Refractory Installation Quality Control Guidelines – Inspection and Testing Monolithic Refractory Linings and Materials”:

OBJECTIVES

This program will help the participants to understand the different mechanical operations of Refractories. Safe operation of Refractory’s requires that all components are protected using proper parts and procedures. This program will provide an overview of all these topics.

OUTLINE

A.   General:

1. Definition of Terms

2. Quality Control elements

3. Physical Property Requirements

4. Inspections

5. References.

 

B.   Work Execution:

  1. Documentation
  2. Material Qualification Testing
  3. Applicator Qualification Testing
  4. Installation

 

C.   Testing:

  1. As-Installed Testing
  2. Test Specimen Preparation
  3. Test Procedures

 

D.   Post Installation:

  1. Curing of Newly Installed Linings
  2. Dry out of Newly Installed Linings

WHO SHOULD ATTEND

All those whose job involves dealing with Refractory Inspection, Inspection Engineers, Mechanical Engineers, Quality Control and Technical Supervisory personnel.

DURATION

5 Day(s)